From the blog

Infrastructure Expansion in South Florida

Infrastructure Expansion in South Florida

This buggy will drill a 10’ diameter hole. It's currently working in the Everglades in South Florida. The drill is a Cat AF190E and the pontoons are 45’ x 8’ x 8’. The buggy weighs over 175,000 pounds when it is assembled ready to work.

40S Custom Amphibious Plow

40S Custom Amphibious Plow - Canada

This custom buggy was created to plow fiber-optic cable through a frozen wetland in the tundra. It plowed almost 900 miles of fiber through northern Canadaian muskeg. It buried ½” cable 32” deep with a Broun V-75 and never even hooked up the vibratory-- it was pulled completely static!